Implementing projects:

SWIM-SM: Support Mechanism of the SWIM Programme

SWIM-ACLIMAS:  Adaptation to Climate Change of Mediterranean Agricultural Systems

SWIM-IMPROWARE: Innovative Means to Protect Water Resources in the Mediterranean Coastal Areas through Re-injection of Treated Water

SWIM- Sustain Water MED:  Network of demonstration activities for sustainable integrated wastewater treatment and reuse in the Mediterranean countries 

SWIM- WADIS-MAR: Water harvesting and Agricultural techniques in Dry lands: an Integrated and Sustainable model in MAghreb Regions

Activity type

Activity title / short description

Status

Date

Implementing project

Model elaboration Model able to simulate the transport, diffusion and reaction of chemical species in the natural environment, after the sand filtration treatment On-going 2014 SWIM-IMPROWARE

Regional Assessment with National Focus

Regional Assessment of past drought& flood episodes and their management in Selected SWIM-SMPCs 

Implemented

February 2015

SWIM-SM

Regional awareness raising campaign

Awareness raising of farmers on the potential health issues related to the re-use of treated wastewater in irrigation: production of information materials and organization of an information session

Implemented

January 2015

SWIM-SM

Field Workshops Field Workshops concerning agronomic and Public Participatory GIS Activities and South-South experience exchange  Implemented 10-12 December 2014 SWIM WADIS-MAR
Report Report on agronomyc activities in Oum Zessar site, Medenine Implemented December 2014 SWIM WADIS-MAR
Data Elaboration

Processing of hydro geological, iso-chemical and isotopic data related to water quality 

Implemented November-December 2014 SWIM WADIS-MAR
Training Course Advanced tools to predict water stress and its effect on the yield of field crops Implemented 24-27 November 2014  SWIM-ACLIMAS
Tender procedures  Launching of tender for the installation of baffles and for the construction of the sand filter treatment at Korba wastewater treatment station Implemented 1 November 2014 SWIM-IMPROWARE
Evaluation/Monitoring  First phase of the evaluation of the irrigation system to monitor activities before and after the upgrade of the Korba wastewater treatment plant. Results will show the current effectiveness of the WWTP in Korba, before the upgrade  Implemented October 2014 SWIM-IMPROWARE
Evaluation/Monitoring Impact and evaluation mission of the pilot project in Tunisia Implemented October 2014 SWIM-SUSTAIN WATER MED
Self-evaluation workshop Self-evaluation workshop on the status of Participatory Irrigation Management / Irrigation Management Transfer (PIM/IMT) in the country  Implemented 29-30 September 2014 SWIM-SM
Technical mission

Technical mission in Médénine and Tunis to finalize tender procedures for works related to the design of the artificial aquifer recharge intervention (recharge basins, vadose-zone wells, also called dry wells and recharge wells with recharge chambers) for the Trias aquifer in the Oum Zessar watershed and discuss dissemination workshops, finance and administration aspects, progress of field activities and the Public Participatory GIS activity (PPGIS) to be carried out in November/December with the participation of Biskra and Médénine farmers.

Implemented 7-10 September 2014 SWIM WADIS-MAR
Communication campaign

As part of the Communication campaign "ANY DROP OF WATER" started in April 2014 a great number of workshops, meetings and events for school and University students, farmers, women, industrials, ecc. have been organised and great visibility has been given to the the issues of Water Scarcity, Water Saving and Water Treatment on the local press to raise the awareness of the Broad Public

Implemented July-September 2014 SWIM-IMPROWARE
Monitoring plan Development of a monitoring plan to verify the pollutants removal efficiency of the wastewater treatment plant in Korba  Implemented July-September 2014 SWIM-IMPROWARE
Elaboration of a desinfection treatment Elaboration of a desinfection treatment to be tested at lab scale in order to additionally improve the quality of the maturation ponds effluent in the wastewater treatment plant of Korba Implemented July-September 2014 SWIM-IMPROWARE
Study Two numerical studies to evaluate the effects of a sand filtration treatment upstream the tertiary treatment and the installation of baffles in the maturation ponds as possible solutions for the wastewater treatment plant of Korba Implemented July-September 2014 SWIM-IMPROWARE
GIS Platform Set-up of a GIS Platform to monitor the evolution of the groundwater use, pumping rates, piezometric levels, salt water intrusion, water quality and hydro-geological settings in Korba Implemented September 2014 SWIM-IMPROWARE
Workshop Workshop to provide professionals with a detailed introduction to the TEM methods used for hydro-geological investigations, in terms of data acquisition, processing and interpretation Implemented July 2014 SWIM-IMPROWARE
Geo-physical survey Geophysical survey to gather new information about the hydro-geological setting of the Korba area Implemented July 2014 SWIM-IMPROWARE
Communication campaign Launching of the Communication Campaign “ANY DROP OF WATER”  implying activities such as the involvement of Local Stakeholders, Communication, Capacity Building and Dissemination. It has started with a workshop dedicated to anyone who wishes to become familiar with the Research Component of IMPROWARE (hydrogeological and technical surveys) and with activities tackling Education on Environmental Protection for students aged 10 to 17, both in Tunis and in the Korba area, with the collaboration of a local NGO  Implemented April 2014 - SWIM-IMPROWARE
Agricultural interventions Agricultural interventions consisting on deficit irrigation, at many levels on crops during all the cycle or at some crucial stages of growth in the 3 chosen areas Chaabet El Anz site (up-stream area), Loudayette site (mid-stream area), Oued Moussa site (Down-stream area) On-going April 2014 - SWIM WADIS-MAR
Training

Training on a Monitoring & Evaluation system developed by SWIM-SM in relation to the Participatory Irrigation Management / Irrigation Management Process (PIM/IMT) 

Implemented 23-27 June 2014 SWIM-SM
Training course

Training course on Database and Geological 3D Modeling 

Implemented 25-26 June 2014 SWIM WADIS-MAR
Spectroradiometric Measurements Campaign Spectroradiometric Measurements Campaign in the study area of the extended hydrogeological basin of Oum Zessar (Medenine Governorate area)  Implemented 16–19 June 2014 SWIM WADIS-MAR
Artificial aquifer recharge interventions Design of the artificial aquifer recharge intervention (recharge basins, vadose-zone wells, also called dry wells and recharge wells with recharge chambers) for the Trias aquifer in the Oum Zessar watershed (including the final costs estimation and the materials selection). Implemented June 2014 SWIM WADIS-MAR
Field work
  • Geology field trip
  • Data collection (structural geological data and hudrogeological data)
  • Collection of data for new geological interpretation
Implemented April-June 2014 SWIM WADIS-MAR
Ground truth campaign Ground truth campaign Implemented April-June 2014 SWIM WADIS-MAR
Interviews Interviews and briefings with selected local beneficiaries (farmers) Implemented April-June 2014 SWIM WADIS-MAR
Training Course Operation and maintenance of irrigation systems fed with treated wastewater Implemented April-June 2014 SWIM-Sustain Water MED
Training Course Wastewater sampling Implemented April-June 2014 SWIM-Sustain Water MED
Training Course Regulatory and normative framework of wastewater quality monitoring Implemented April-June 2014 SWIM-Sustain Water MED
Training Course Management of wastewater treatment plants Implemented April-June 2014 SWIM-Sustain Water MED
Geophysical survey Geophysical survey using the ground TEM methodology  Implemented April-June 2014 SWIM-IMPROWARE
Tender procedures Launch the tender for the construction of the Tunisian pilot activity in Medinine Implemented April-June 2014 SWIM-Sustain Water MED
Scientific Days Scientific days on: “Climate change and adaptation measures”, INAT, Tunis Implemented 20 – 21 May 2014 SWIM-ACLIMAS
Technical visit Technical visit to monitor and discuss on-going demonstration and implementation activities in the target area Implemented 19-24 May 2014 SWIM-ACLIMAS
Geoelectrical campaign / theoretical and field trainings Geoelectrical campaign in Medenine including: (1) a theoretical training addressed to project partner’s staff providing the basic principles of the electrical resistivity method; (2) a field training on a galvanic coupled resistivity system aiming at the production of 2D resistivity tomographies for the definition of the stratigraphy of the area and the related saturation condition of the subsoil. The geophysical  survey was made along the area were the artificial recharge system will be realized Implemented 7-12 April 2014

SWIM - 

WADIS-MAR

Field Day Field Day on : “Wheat crop, fertilization, weed and pest control” in Menzel Temime, Nabeul Implemented 2 April 2014 SWIM-ACLIMAS
Field surveys/training Geophysical prospections and a session of training on the job and data analysis/processing for technical staff of IRA and other local institutions. Planned March 2014

SWIM - 

WADIS-MAR

Training Training course on: “Integrated management of water and soil resources”  Implemented 24–28 February 2014  SWIM-ACLIMAS
Technical meetings

Technical meetings on administrative and financial aspects. Field visit for monitoring of agronomical activities in some demonstration sites (Chaabet el Anz, Ksar el Hallouf, Bedoui and Megarine); 

Implemented 10-15 February 2014

SWIM - 

WADIS-MAR

Tendering process

Launching of tendering process for the Tunisian pilot activities (construction of a sand filter, procurement of laboratory equipment, establishment of a cross-sector water quality control IT platform, environmental impact analysis) 

Implemented  2014 SWIM-Sustain Water MED
Technical meetings/surveys Artificial aquifer recharge:Finalization of the design (including the final costs estimation, the materials selection, the topographic survey) of the artificial aquifer recharge intervention Implemented 22-25 January, 2014

SWIM - 

WADIS-MAR

Kick-off meeting

Kick-off Meeting of the Pilot Implementation for the System to Monitor and Evaluate the Participatory Irrigation Management (PIM) and Irrigation Management Transfer (IMT) Process

Implemented 16 January 2014 SWIM-SM
Study

Baseline Assessment Study for the pilot project on treated wastewater quality controlling in Oueljet El Khodher, Medenine Province

Implemented December 2013 SWIM-Sustain Water MED
Sowing Sowing activities in the demonstration sites Implemented November-December 2013 SWIM-ACLIMAS

Artificial aquifer recharge intervention design

A proposal for the artificial groundwater recharge for the Trias aquifer in the Oum Zessar watershed was developed. Upon discussion and sharing with partners, intervention areas were also selected. The artificial recharge systems so defined, includes recharge basins, vadose-zone wells, also called dry wells and recharge wells with recharge chambers in Tunisia. The outputs of this activity consist of technical designs (CAD format) of the recharge systems and technical reports Implemented October-November 2013

SWIM - 

WADIS-MAR

Consultation Workshop Consultation workshop with stakeholders from the Oueljet El Khodher Wastewater Treatment Plan and affected farmers Implemented September 2013 SWIM-Sustain Water MED
Technical meeting/field visits

Technical mission in Medenine to make the state of the art in agronomic selected sites:

- Bedoui site, where deficit irrigation management techniques for barley and olive trees are compared to the traditional irrigation management adopted by the farmer;

- El Mgharine site, where a demonstration activity are beeing carried out for assessing the response of olive, citrus and vine trees to different irrigation strategies in order to define the best irrigation program and for reinforcing farmers’ capacities to face the problem of water scarcity by helping them improve their knowledge about the integration of information on soil, evapotranspiration, and salinity in water management;

- Ksar Halloufwhere agronomic activities are focused on traditional cropping promotion and support for improved irrigation management in traditional mountainous oasis and in jessours  systems.

Implemented 17 – 21 September  2013

SWIM - 

WADIS-MAR

Data management Technical mission to agree with the local Partners the strategies necessary for the acquisition of any needed further information/data Implemented July 2013 SWIM-IMPROWARE
Capacity building Capacity building activities for the local Development Authority Officers of Nubariya (Egypt) and for relevant Authorities in Korba (Tunisia) in interviewing local stakeholders to understand their needs and expectations regarding the pilot activities and reporting interview results  Implemented June/July 2013 SWIM-IMPROWARE
Data management Processing of data related to the hydrologic/hydrogeologic system description in the two study sites (Nubariya Wadi Al-Natrun, Egypt and Korba,Tunisia) and set up of a GIS archive Implemented June 2013 SWIM-IMPROWARE
Workshop A Public Participatory GIS (PPGIS) workshop in Medenine involving beneficiary farmers of the identified micro-catchments and other stakeholders (representatives of local authorities, researchers, professionals, representative of civil society, NGO) Implemented 13 June 2013

SWIM - 

WADIS-MAR

Questionnaire Preparation of a questionnaire to be compiled by farmers in Algeria and Tunisia within the Public Participatory GIS (PPGIS) and agronomic activities to identify socioeconomic characteristics, farming practices and farmers’ perceived environmental and climate change impacts Implemented 2013

SWIM - 

WADIS-MAR

Hydrogeological plan Preparation of a tentative hydrogeological and agricultural intervention plan. 3 micro-catchments of Oum Zessour watershed have been defined for intervention: Chaabet El Anaz site (up-stream area), Loudayette site (mid-stream area), Oued Moussa site (Down-stream area) Implemented 2013

SWIM - 

WADIS-MAR

Field visits Field visits to: 1) make short interviews and briefings with selected local beneficiaries (farmers); 2) collect salinized soils samples for hyperspectral remote sensing analysis Implemented 2013

SWIM - 

WADIS-MAR

Workshop Organisation of a Workshop on Experience and challenges of wastewaster treatment and reuse in Jordan and Tunisia Implemented 9 May 2013 SWIM - Sustain Water MED
Field Day Field Day on improving rainfed cropping systems Implemented 8 May 2013 SWIM-ACLIMAS
Technical meeting / field visits Technical meetings and field visits in Medenine with relevant stakeholders to discuss about aquifer artificial recharge solutions, agronomic, Public Participatory GIS (PPGIS) activities and tender procedures Implemented 5-10 May 2013

SWIM - 

WADIS-MAR

Training Three days training on Database and Groundwater Modeling during which participants of Institut des Région Arides - Tunisie (IRA) and Agence nationale des Ressources Hydrauliques – Algerie (ANRH) shared experience with the Système Aquifère du Sahara Septentrional project (SASS) and SASS consultation Mechanism Implemented 22-26 April 2013

SWIM -

WADIS-MAR

Training Training Course on the Use of modern technologies (GIS) for spatial elaboration and analysis of agro-ecological and sustainable management of Mediterranean agricultural systems Implemented 16-18 April 2013 SWIM-ACLIMAS
Field Day Field Day on best practices in varieties resistance and yield Implemented 26 March 2013 SWIM-ACLIMAS
Field day Field Day on best practices for weed and pest control under supplemental irrigation Implemented 19 March 2013 SWIM-ACLIMAS
Field day Field Day on best Practices for weed and pest control under supplemental irrigation Implemented 18 March 2013 SWIM-ACLIMAS
Field day Field day on best practices for fertilization-pest control Implemented 14 March 2013 SWIM-ACLIMAS
Review + Consultation workshop Review and analysis of the status of implementation of Wastewater Strategies and/or Action Plans in Tunisia and National Consultation Implemented 5 March 2013 SWIM-SM
Field Day Field Day on Varieties Fertilization / weed control Implemented 30 January 2013 SWIM-ACLIMAS
Consultation workshop

Consultation workshop on the cost of the environmental degradation and remediation of the Mejerda River Basins (Tunisia)

Implemented 7 December 2012 SWIM-SM
Steering Committee Meeting Establishment of National Steering Committee for the pilot project in Tunisia Implemented 2012 SWIM Sustain Water MED

Assessment

Assessment of the cost of environmental degradation at the basin level in Tunisia (Medjerda River)

Implemented

2012

SWIM-SM

Survey / training

Hydrogeological and isotopic sampling survey aiming at the hydrogeological reconstruction and modelling of the intervention area of Oum Zessar and training of partner’s technicians on how to execute a hydrogeological survey and apply internationally recognized standards for specific laboratory analysis.

Implemented

November 2012

SWIM-

WADIS - MAR

Regional Assessment with National Focus

Regional Review of National Water Plans and/or Strategies

Implemented 2012 SWIM-SM
Information Workshop

SWIM Media Information Workshop

Implemented June 2012 SWIM-SM
Regional Assessment with National Focus

Regional Assessment - Water Users' Associations in the SWIM-SM Partner Countries

Implemented 2012 SWIM-SM

 

 

Implementing projects:

SWIM-SM: Support Mechanism of the SWIM Programme

SWIM-ACLIMAS:  Adaptation to Climate Change of Mediterranean Agricultural Systems

SWIM- WADIS-MAR: Water harvesting and Agricultural techniques in Dry lands: an Integrated and Sustainable model in MAghreb Regions

Activity type

Activity title / short description

Status

Date

Implementing project

Regional awareness raising campaign Awareness raising of farmers on the potential health issues related to the re-use of treated wastewater in irrigation: production of information materials and organization of an information session Planned 2014 SWIM-SM
Processing of water quality data Processing of hydro geological, iso-chemical and isotopic data related to water quality  Implemented November-december 2014

SWIM-

WADIS - MAR

Technical and administrative mission Technical and administrative mission Implemented 10-13 November 2014

SWIM-

WADIS - MAR

Technical mission Organisation of a technical mission in Algiers to finalize the procedures for launching the tender of works related to the design of the artificial aquifer recharge interventions (recharge basins, vadose-zone wells, also called dry wells, and recharge tranches) for the infero-flux aquifer in the Oued Biskra and discuss administrative aspects as to finalize equipment purchases procedures  Implemented 14-27 July 2014

SWIM-

WADIS - MAR

Artificial Aquifer recharge Finalisation of the design of the artificial aquifer recharge interventions (recharge basins, vadose-zone wells, also called dry wells, and recharge tranches) for the infero-flux aquifer in the Oued Biskra, the cost analysis and the selection of intervention areas (including the final costs estimation, the materials selection, the topographic survey, tenders for works, works supervision, procedure for work authorization) Implemented April-Juin 2014

SWIM-

WADIS - MAR

Agronomic intervention plan Finalisation of the agronomic intervention plan. The agronomic demonstrative intervention sites have been identified in the project area for the main crops grown (mainly dates palms, tomatoes, and wheat) with different farming and irrigation systems in the region Implemented April-Juin 2014

SWIM-

WADIS - MAR

Technical visit Technical visit to monitor and discuss on-going demonstration and implementation activities in the target area.   Implemented 12-26 April 2014 SWIM-ACLIMAS
Training Course Training course on: "Use of remote sensing techniques for improving resource use efficiency in cereals cultivation" Implemented 14–16 April 2014 SWIM-ACLIMAS
Training Training session on agro-climatic issues at Biskra Planned March-April 2014 

SWIM-

WADIS - MAR

Training Course

Training course on: "Best management practices for cereals cultivation in Mediterranean environments" 

Implemented

18–20 March 2014

SWIM-ACLIMAS
Technical meetings/surveys Technical mission at Biskra for the finalization of the executive plan of the artificial aquifer recharge intervention in the infero-flux aquifer in the Oued Biskra (Algeria) Planned 1-6 March 2014 

SWIM-

WADIS - MAR

Technical meeting

Technical meeting on administrative and financial aspects

Implemented 15-19  February 2014

SWIM-

WADIS - MAR

Technical meetings /field  surveys 

Agronomical activities:Field trips were carried out to identify agronomic demonstrative intervention sites. Sites with different issues were visited. These sites represent the main crops grown with different farming and irrigation systems in the region and bringing together the various problems that farmers are suffering. Date palms and greenhouses vegetable crops and cereals are the main practiced cultivations.

Artificial aquifer recharge:Finalization of the design (including the final costs estimation, the materials selection, the topographic survey) of the artificial aquifer recharge intervention

Implemented 18-25 January, 2014

SWIM-

WADIS - MAR

Agreement

Signature of agreement between ITDAS and ANRH. ITDAS, through the project will care of:

•Providing sites at farm level for the implementation of agronomical activites;

•Giving help to buy all needed equipments (irrigation material, fertilizers, seeds, plastic etc )

•Giving support to engage the chamber of agriculture and farmers  in participatory and learning events of the Project
Implemented 19 January  2014

SWIM-

WADIS - MAR

Sowing activities Sowing activities in the demonstration sites Implemented November-December 2013 SWIM-ACLIMAS

Analysis + National consultation

Cost/benefit analysis of investments for mitigating water pollution in the Seybouse River basin

Implemented

November 2013

SWIM-SM

Technical meetings

A technical mission was held to define: i) a time plan and tasks for the implementation of works related to artificial water recharge (tenders for works, works supervision, procedure for work authorization) and; ii) the terms of reference of the agreement to be signed between the relevant institutions.

Implemented 13-15 November 2013

SWIM-

WADIS - MAR

Artificial aquifer recharge intervention design

A proposal for the artificial groundwater recharge for the infero-flux aquifer in the Oued Biskra was developed. Upon discussion and sharing with partners, intervention areas were also selected. The artificial recharge systems so defined, includes recharge basins, vadose-zone wells, also called dry wells, and recharge tranches for the intervention. The outputs of this activity consist of technical designs (CAD format) of the recharge systems and technical reports

Implemented October - November 2013

SWIM-

WADIS - MAR

Training course Training course on “Water stress impact to wheat morpho-physiological characteristics and yield” Implemented 10-12 September 2013 SWIM-ACLIMAS
Technical meeting Technical mission to define a preliminary design and cost analysis of the artificial aquifer recharge interventions Implemented 6-10 July 2013

SWIM-

WADIS - MAR

Questionnaire Preparation of a questionnaire to be compiled by farmers in Algeria and Tunisia within the Public Participatory GIS (PPGIS) and agronomic activities to identify socioeconomic characteristics, farming practices and farmers’ perceived environmental and climate change impacts. Implemented  

SWIM-

WADIS - MAR

Technical meetings / surveys  Technical meetings and field visits in Biskra to perform a water sampling campaign; make new hydrogeological surveys and a video of possible identified intervention sites; define an agronomic intervention plan in synergy with the local agricultural extension agency ITDAS. Implemented 10-17 May 2013

SWIM-

WADIS - MAR

Training Three days training on Database and Groundwater Modeling during which participants of Institut des Région Arides - Tunisie (IRA) and Agence nationale des Ressources Hydrauliques – Algerie (ANRH) shared experience with the Système Aquifère du Sahara Septentrional project (SASS) and SASS consultation Mechanism Implemented 22-26 April 2013

SWIM-

WADIS - MAR

Survey / training

Hydrogeological and isotopic sampling survey aiming at the hydrogeological reconstruction and modelling of the intervention area of Wadi Biskra and training of partner’s technicians on how to execute a suitable hydrogeological survey and apply internationally recognized standards for specific laboratory analysis.

Implemented

June 2012

SWIM-

WADIS - MAR

 

 

 

Implementing projects:

SWIM-SM: Support Mechanism of the SWIM Programme

SWIM-ACLIMAS:  Adaptation to Climate Change of Mediterranean Agricultural Systems

Activity type

Activity title / short description

Status

Date

Implementing project

Field Day Field day at Ryaak, Bekaa Valley to discuss with farmers the following topics: 1) Effect of drought on wheat production; 2) New varieties of wheat and barley; and 3) How to save irrigation water. A total of 16 farmers attended the field day. Implemented 26 June 2014 SWIM-ACLIMAS
Field Day Field day in Rasm El Hadath, Bekaa Valley to discuss with farmers of different problems, including: 1) Effect of drought on wheat production; 2) New varieties of wheat and barley; and 3) How to save irrigation water Implemented 23 June 2014 SWIM-ACLIMAS
Field Day Field day in El Hamrat, Bekaa Valley to discuss with farmers the following topics: 1) dry year and normal year; 2) Crop rotation; 3) Analysis of the soil; 4) Cultivation without plowing Implemented 15 May 2014 SWIM-ACLIMAS
Field Day Field day at Majdaloun, Bekaa Valley, to discuss with farmers the following main points: 1) Impact of drought on crop production; 2) impact of ice on the production of crops; 3) new varieties of wheat and barley; 4) How to save irrigation water Implemented 13 May 2014 SWIM-ACLIMAS
Regional Guidelines with National Focus Guidelines on measures for improving compliance with water legislations and assessment of enforcement capacity in the SWIM-SM Region with focus on Egypt, Israel, Jordan, Lebanon and Morocco  Implemented February 2014 SWIM-SM
Video Video about an interview with an old farmer Implemented 12 February 2014 SWIM-ACLIMAS
Sowing Sowing activities in the demonstration sites Implemented November-December 2013 SWIM-ACLIMAS
Field Day Field day on the promotion of cereals products from Bekaa Valley Implemented 3 December 2013 SWIM-ACLIMAS
Video Video about sowing time in Baalbeck, Bekaa Implemented 12 November 2013 SWIM-ACLIMAS
Field Day Field Day on a) Conservation tillage versus conventional tillage, b) Weed management in conservation tillage, c) New wheat and barley varieties, d) Climate change impact on crop production (Baalbeck). Implemented 12 November 2013 SWIM-ACLIMAS
Video Video about sowing time in Shaat village, Bekaa Implemented 11 November 2013 SWIM-ACLIMAS
Field Day Field Day ona) Conservation tillage versus conventional tillage, b) Weed management in conservation tillage, c) New wheat and barley varieties, d) Climate change impact on crop production (Shaat village).  Implemented 11 November 2013 SWIM-ACLIMAS
Field Day Field Day on “Farming methods to adapt to climate change” Implemented 26 September 2013 SWIM-ACLIMAS
Field Day Field Day on “First year results of ACLIMAS implementation activities” Implemented 4 July 2013 SWIM-ACLIMAS
Video Video about the training on 'Climate Smart Agriculture' Implemented   SWIM-ACLIMAS

Field Day

Field Day on the first year results of ACLIMAS demonstration activities

Implemented

18 June 2013

SWIM-ACLIMAS

Training Course

Training course on “Climate smart agriculture: capacity building for extension services”, LARI research station, Tal Amara

Implemented

19-21 March, 2013

SWIM-ACLIMAS

Analysis + National Consultations

Cost/benefit analysis of investments for mitigating water pollution in the Litani River Basin and National Consultation

Implemented

 2013

SWIM-SM

Regional Review with National Focus

Regional Review of National Water Plans and/or Strategies

Implemented 2012 SWIM-SM
Information workshop

SWIM Media Information Workshop

Implemented May 2012 SWIM-SM
Regional Assessment with National Focus

Regional Assessment - Water Users' Associations in the SWIM-SM Partner Countries

Implemented
 
2012 SWIM-SM

 

Implementing projects:

SWIM-SM: Support Mechanism of the SWIM Programme

SWIM-ACLIMAS:  Adaptation to Climate Change of Mediterranean Agricultural Systems

SWIM-All Across the Jordan: Transboundary NGO Master Planning of the Lower Jordan River Basin

SWIM- Sustain Water MED:  Network of demonstration activities for sustainable integrated wastewater treatment and reuse in the Mediterranean countries 

Activity type

Activity title / short description

Status

Date

Implementing project

Demonstration project Handing over of the Wastewater Treatment Plant to the Public Security Directorate Planned March 2015 SWIM- Sustain Water MED
Training course Training course by the construction contractor on the Operation and Maintenance (O&M) of the Wastewater Treatment Plantfor the Public Security Directorate(PSD)staff. Planned March 2015 SWIM- Sustain Water MED
Regional Assessment with National Focus Regional Assessment of past drought& flood episodes and their management in Selected SWIM Partner Countries Implemented February 2015 SWIM-SM
Impact and evaluation mission Impact and evaluation mission of the pilot project Implemented September 2014-March 2015 SWIM- Sustain Water MED
Self-evaluation workshop Self-evaluation workshop on the status of Participatory Irrigation Management / Irrigation Management Transfer (PIM/IMT) in the country  Implemented 15-16 September 2014 SWIM-SM
Stakeholders workshop

Stakeholders workshop to disseminate the outputs of the pilot project implementation and assess their perception regarding the pilot’s long-term impact on national efforts to upscale Decentralized Wastewater Management (DWWM) country-wide.

Implemented 8 September 2014 SWIM- Sustain Water MED
Inauguration of pilot project Inauguration of the on-site wastewater treatment plant at the Public Security Directorate (PSD) nearby Amman. The plant uses the Sequencing Batch Reactor technology (SBR) and has a capacity of 150 cubic meters per day, serving approx. 2,500 persons.  Implemented 22 June 2014 SWIM- Sustain Water MED
Training

Training on a Monitoring & Evaluation system developed by SWIM-SM in relation to Participatory Irrigation Management (PIM) / Irrigation Management Transfer (IMT)

Implemented 1-5 June 2014 SWIM-SM
Field day

Field day at Maru Agricultural Research Station, Irbid, to demonstrate to farmers the best management practices of cereal cultivation under the arid and semi arid conditions and to explain the best ways to manage the limited water resources for better water use efficiency of cereals.

Implemented 29 April 2014 SWIM-ACLIMAS
Technical visit

Technical visit to monitor and discuss the on-going demonstration/implementation activities in the target areas.

Implemented

13 – 17 April 2014

SWIM-ACLIMAS
Training Course

Training Course on: “Optimizing Resource Use in Cereals: Application of Physiology in Agronomy and Breeding”, Amman-Irbid, Jordan, 14 – 16 April 2014

Implemented 14 – 16 April 2014 SWIM-ACLIMAS
Field day Field day on "Weed Control" in Irbid Implemented 11 March 2014 SWIM-ACLIMAS
Tendering process Launching of the tendering process for the implementation of reuse activities for the Jordanian pilot project (design of irrigation network and plan, impact assessment)  Implemented March 2014 SWIM- Sustain Water MED
Public Hearing Public Hearing to discuss the findings of the Baseline Report on the current situation of the Lower Jordan River Basin and Valley Implemented March 2014 SWIM-All Across the Jordan
Video Video on: “Objectives and Importance for Jordan (Arabic)” Implemented January-March 2014 SWIM-ACLIMAS
Video Video on: “Improved varieties at Qasabat, Irbid, Jordan (Arabic)” Implemented January-March 2014 SWIM-ACLIMAS
Video Video on: “On ground implementation, Ramtha, Jordan (Arabic)" Implemented January-March 2014 SWIM-ACLIMAS
Video Video on: “On ground implementation, Bani Khananah, Jordan (Arabic)” Implemented January-March 2014 SWIM-ACLIMAS
Video Video on: “On ground implementation full pack Bani Khananah (Arabic)”  Implemented January-March 2014 SWIM-ACLIMAS
Field day Field day on "Planting Dates and Fertilizer Application" in Irbid Implemented 12 February 2014 SWIM-ACLIMAS

Regional Assessment with National Focus

Develop regional guidelines on measures for improving compliance with water legislations and assess the available enforcement capacity and mechanisms currently practiced in SWIM-SM region to enforce water legislations with focus on 4 SWIM-SM PCs

Implemented

February 2014

SWIM-SM

Sowing Sowing activities in the demonstration sites Implemented November-December 2013 SWIM-ACLIMAS
Pilot implementation Kick-off meeting of the pilot implementation in Jordan of the Monitoring and Evaluation system for Participatory Irrigation Management and Irrigation Management Transfer (IMT) process Implemented 9 December 2013 SWIM-SM
Study Finalization of Environmental Impact Assessment and the Environmental Management Plan of the decentralized wastewater treatment plant at the Public Security Directorate near Amman, Jordan. Implemented September 2013 SWIM- Sustain Water MED
Construction Work Begin of the construction work on the decentralized wastewater treatment plant at the Headquarters of the Public Security Directorate (PSD) –using the Sequencing Batch Reactor (SBR) technology. On-going September 2013 SWIM- Sustain Water MED
Steering Committee Meeting Meeting of the Jordanian National Steering Committee and subsequent approval of the design work on the decentralized wastewater treatment plant (using the SBR technology) Implemented 16 September 2013 SWIM- Sustain Water MED
Company selection procedures Selection of a qualified company to design and construct a wastewater treatment plant based on the sequencing batch reactor (SBR) technology that is going to serve the Public Security Directorate (PSD) campus in the Mugablane area (near the City of Amman, Jordan) with 150 m3 treated wastewater to be reused for irrigation purposes Implemented June 2013 SWIM- Sustain Water MED
Steering Committee meeting Meeting of the Jordanian National Steering Committee and subsequent approval of the Environmental Impact Assessment Implemented 13 June 2013 SWIM- Sustain Water MED
Consultation Workshop Consultation Workshop with Stakeholdersfrom the Jordanian pilot project in order to inform them of pilot project and include them in the implementation process according to interests and roles. Implemented 12 June 2013 SWIM- Sustain Water MED
Training Course Training Course on Conservation Agriculture Implemented 15-17 May 2013 SWIM-ACLIMAS
Field Day Presentation of the performance of introduced varieties and management practices to farmers, extension agents, researches and decision makers (Bani Kananeh)  Implemented 14 May 2013 (afternoon) SWIM-ACLIMAS

Field Day

Presentation of the performance of introduced varieties and management practices to farmers, extension agents, researches and decision makers (Maru Station)

Implemented

14 May 2013 (morning)

SWIM-ACLIMAS

Training Course

Training Course on Wheat under full-package practices - comparing full-package with conventional practices 

Implemented

23 April 2013

SWIM-ACLIMAS

Field Day Field Day on “Farming methods to adapt to climate change” Implemented 3 April 2013 SWIM-ACLIMAS
Training Course Training Course on Conservation agriculture as an active measure to cope with climate change Implemented 1-3 April 2013 SWIM-ACLIMAS
Consultation Workshop Consultation Workshop with policy-makers and civil society organisations from the agricultural, health, environmental and water sector to determine impact indicators for the decentralized wastewater treatment plant at the Headquarters of the Public Security Directorate Implemented 17 March 2013 SWIM- Sustain Water MED
Study

Baseline Assessment Study for the pilot project in Jordan

Implemented February 2013 SWIM- Sustain Water MED
Steering Committee Meeting Meeting of the Jordanian National Steering Committee to update members on progress on Baseline Assessment and Stakeholder Anlaysis. Implemented 27 February 2013 SWIM- Sustain Water MED

Training course

Training course on Canopy Sensors

Implemented

25- 27 February 2013

SWIM-ACLIMAS

Field Day

Field Day on “Promoting ACLIMAS demonstration activities”

Implemented

13 March 2013

SWIM-ACLIMAS

Steering Committee Meeting Meeting of the Jordanian National Steering Committee to discuss and approve the role of the Committee as well as the overall pilot project outline. Implemented 27 November 2012 SWIM- Sustain Water MED
Regional Assessment with National Focus

Regional Review of National Water Plans and/or Strategies

Implemented 2012 SWIM-SM
Information workshop SWIM Media Information Workshop Implemented May 2012 SWIM-SM
Regional Assessment with National Focus

Regional Assessment - Water Users' Associations in the SWIM-SM Partner Countries

Implemented 2012 SWIM-SM

 

 

SMTWTFS
28
29
30
31
1
2
3

Latest News

Twenty-nine representatives from relevant institutions, the private sector (investors/operators) and NGOs from Algeria, Egypt,...
Operators and engineers from the South Mediterranean countries involved in wastewater treatment (WWT) and other stakeholders...
The new film produced to narrate the current achievements of the SWIM program is now available online in English. To view the...
18 representatives of the public water sector, the private insurance sector and NGOs from 7 countries (Algeria, Egypt, Israel,...
Consolidation and institutionalisation of a system set up to enhance participatory irrigation management in the south...
The 4th Steering Committee of SWIM-SM was organised with the aim of presenting and discussing the achievements of the project in...
How to evaluate the damages and prioritize specific actions for improving the management of the basins is at the heart of a...
SWIM-SM has recently published a report and a set of guidelines intended to assist legislators and government officials from...
How to achieve a better compliance with water laws in the South Mediterranean countries was at the focus of a 2 days policy...
Based on an assessment recently released by SWIM-SM the cost of water resource degradation of the Upper Litani Basin (ULB)...
The Regional workshop aims to introduce the M&E system and the lessons learnt from the pilot implementation to the SWIM...
ERANETMED, an EU initiative aiming at co-ordinating research activities, has pre-announced the first joint call for...
Under its financing pillar SWIM-SM organises on 30-31 October 2014 a training on Risk and Insurance in...
In collaboration with the National partners and stakeholders in Jordan and Tunisia SWIM-SM is conducting a 2-day...
A training was organised on 23-27 June 2014 to familiarise Tunisian stakeholders with the system set-up by SWIM-SM to enable the...
41 environment and water specialists from relevant Ministries, River Basin Agencies, Universities, Research Centers and NGOs of...
An assessment recently released by SWIM-SM identifies the conditions under which specific investments aimed to reduce the...
The Expert Group Meeting was organized with a dual purpose: (1) to review, discuss and validate the findings of a recent...
A training was organised on 1-5 June 2014 to familiarise Jordanian stakeholders with the system set-up by SWIM-SM to enable the...
For more information on the modalities click here